Communicator
News |
2020: China's first 100,000 tons/year bio-jet fuel unit was completed in Zhenhai Refining and Chemical. (Source) Jan 2022: Zhenhai Refining and Chemical's 1.2 million tons/year ethylene unit produced qualified products. (Source) 28th June 2021: The first phase of Sinopec Zhenhai Base project was completed in Zhenhai, Ningbo, Zhejiang. The commissioning of this project will add 1.2 million tons of ethylene annual production capacity and 4 million tons of refining annual capacity to Zhenhai Refining and Chemical. (Source) 27th Sep 2021: The 4# atmospheric and vacuum unit was put into operation. In 2022, the energy (steam) consumption of the unit dropped from 11.51 kg of standard oil/ton at the initial start-up to 9.45 kg of standard oil/ton, with significant energy-saving and consumption-reducing effects. 6th Jan 2022; The No. 2 propylene oxide styrene (POSM) unit of Zhenhai Base was successfully put into trial operation. 7th Jan 2023: 18th Oct 2024: Sinopec Ningbo Project EPC General Contracting, Zhenhai Base Phase II Project Double Hydrogenation Unit Delivery! The 1.5 million tons/year jet fuel hydrogenation and 4 million tons/year wax oil hydrogenation units at Sinopec Zhenhai Base have passed the acceptance inspection. (Source) 21st October 2024: The mechanical completion of the 11 million tons/year atmospheric and vacuum distillation unit of the second phase of the Zhenhai base was achieved. This project is the leading unit of the second phase of the base's refining project, and it is also the atmospheric and vacuum distillation unit with the largest crude oil processing capacity of Zhenhai Refining and Chemical. (Source) 30th August 2024: The first batch of main and supporting projects of the Zhenhai Base Phase II - aromatics extraction, catalytic gasoline hydrogenation, and pressure tank area - achieved mechanical completion. So far, the overall schedule of the Zhenhai Base Phase II project has been completed by 95%, and the project construction is stable and orderly. (Source) 23rd Nov 2024: The 1.5 million tons/year No. 2 aviation kerosene hydrogenation unit of the second phase of Zhenhai Base successfully introduced raw aviation kerosene, marking that the first unit of the second phase of the base has entered the feeding test run stage. (Source) |