Indicator Value
3
Indicator Symbol
Comment
There are some understanding issues since the cracker does not produce enough ethylene (600,000 tonnes) to load both PE plants (620,000 tonnes output) and the 1-butene plant (25,000 tonnes), whereby we assume that the 1-butene is consumed by the two PE plants at about 4 weight-% content, also factoring in a 2.6-2.8% loss during polymerization. There is a deficit of 40,000 tonnes that we assume is imported to complete the supply. According to the linked document: "Step II involves firstly the acquisition of ADNOC cracker rights and the related Ethylene storage and terminalling facility." Maybe, alternatively, the two PE plants are running below design capacity.
Document
https://www.pressreleasefinder.com/Borouge/BRGPR008/en/
System Info

User
UserPic  Kokel, Nicolas
Modfied
6/21/2024 4:53 AM
Added
11/29/2023 7:14 PM