Daqing Petrochemical
Entity
Petrochina Daqing Petrochemical Company
Refining and Chemicals Operations
163714
/ Daqing
Heilongjiang
F626+43P, Huagong Rd, Longfeng District

Production Units

  • The primary processing capacity of refining is 10 million tons/year
  • The production capacity of ethylene is 1.2 million tons/year.
  • The production capacity of synthetic ammonia is 450,000 tons/year
  • The production capacity of urea is 800,000 tons/year
  • The production capacity of polyethylene is 1.11 million tons/year
  • The production capacity of polypropylene is 100,000 tons/year.
  • The production capacity of acrylonitrile is 80,000 tons/year.
  • The production capacity of butyl octanol is 200,000 tons/year.
  • The production capacity of styrene is 190,000 tons/year.
  • The production capacity of ABS is 105,000 tons/year.
  • The production capacity of butadiene rubber is 160,000 tons/year.
  • The production capacity of acrylic yarn is 65,000 tons/year.

(Source)

19th Sep 2019 

  • In 1986, the 300,000 ton/year ethylene plant was completed and put into production.
  • In 1999, the 480,000 ton/year ethylene technology transformation was successfully completed.
  • In 2004, the 600,000 tons/year ethylene expansion project was completed and put into production.
  • In 2012, the 1.2 million tons/year ethylene expansion project was completed and put into production.

(Source)

26th June 2019

The 10 million ton oil refining project is advancing rapidly

  • Today, Daqing Petrochemical Company's crude oil processing capacity has jumped from 1 million tons to 10 million tons.
  • The MTBE, alkylation, and hydrocracking transformation projects were completed and put into production as scheduled in 2018.
  • The 2 million tons/year catalytic cracking unit, the 1.2 million tons/year continuous reforming unit, and the supporting storage and transportation projects are all under construction as scheduled. As of May this year, nearly 30,000 tons of MTBE and more than 44,000 tons of alkylated oil have been produced, providing raw material guarantee for Daqing Petrochemical to blend National VI gasoline.
  • On September 30 this year, the newly built 1.2 million tons/year continuous reforming project will be delivered.
  • In December 1963, the first train of refined oil full of hope and trust drove out of Longfeng Station, and the era of China using "foreign oil" was gone forever. The first unit built at that time was a constant pressure reduction unit with a processing capacity of only 1 million tons/year. After several renovations, the capacity increased from 1 million tons/year to 2.7 million tons/year, and then to 3.5 million tons/year.
  • The 600,000 tons/year fluid catalytic cracking unit, which was started and put into production in 1965, was China's first unit designed, constructed and installed independently. 

On May 7 in the large ethylene plant production unit No. 1, the No. 9 cracking furnace broke the previous history of 63 consecutive days of online operation and created the longest continuous operation cycle record of 118 days, ranking first among the same type of cracking furnaces in PetroChina. 

The ethylene plant has three ethylene production units, with various types of cracking furnaces, many types of cracking raw materials, and large differences in quality. In particular, the first ethylene unit has a complex raw material composition and is difficult to operate. Changes in the composition and feed amount of the materials will increase the tendency of coking in the furnace tubes, which is not conducive to the long-term operation of the cracking furnace. However, it is also the "big brother" and leader of the three ethylene units. It was built more than 30 years ago. The process used by the American S.W. Company at that time is now at a backward level of technology, and the maintenance difficulty is incomparable with similar cracking furnaces that have been put into operation in recent years.

(Source)

 


 

Site Master Settings

Status
A
V
P
UoM
Metric Ton
System Info

Modified by
UserPic  Kokel, Nicolas
Modified
12/3/2024 8:32 AM
Added by
UserPic  Kokel, Nicolas
Added
12/3/2024 7:55 AM
Solutions
Solutions

Solution-Reference:

#E1471

No Services yet available.
Enquire in Solutions how we can help you.

Indicator Unit Value
Modelling Status True

Please create Assets first to manage the Mass Balance Processes