Site
-
- ADU without On-Stream Cleaning
-
- Comparative ADU with and without On-Stream Cleaning (OSC)
- Site Category
- Refining and Chemicals Operations
- Location
- Website
- Description
-
ADU nameplate capacity is 100,000 BPD of Brent Crude Oil. The ADU runs 5 years 365/24/7 with On-Stream-Cleaning (OSC) performed every six months for one and half day. Due to OSC, the turn-around to clean the plant at the end of the last year is cut in half, from one month to a half-month. Furnace Inlet Temperature (FIT) at Start-of-Run (SOR) until End-of-Run by Year 5 is according to: SOR - Year 1: 240°C | Year 2: 239°C | Year 3: 238°C | Year 4: 237°C | Year 5: 236°C EOR - Year 5: 235°C Output capacity at end of each year decreases according to: Year 1: 99% | Year 2: 98% | Year 3: 97% | Year 4: 96% | Year 5: 95% The yield is calculated as the FIVE-YEAR AVERAGE (including half a month turn-around at EOR) to be 97.5%. Thus the 5-year average daily Brent Crude consumption is 97,521 BPD instead of 100,000 BPD. Fuel oil consumption at Start-of-Run (SOR) until End-of-Run by Year 5 is according to: SOR - Year 1: 64,000 mt | Year 2: 64332 mt | Year 3: 64664 mt | Year 4: 64996 mt | Year 5: 65328 mt EOR - Year 5: 65646 mt Fuel Oil consumption increase due to Equipment fouling is minimized due to OSC performed every six months.
Site Master Settings
- Status
- L
- V
- P
- Site-Manager
- Kokel, Nicolas
- UoM
- Barrel of oil equivalent (BOE)
System Info
- Modified by
-
Braun, Uwe
- Modified
- 7/8/2024 11:47 AM
- Added by
-
Kokel, Nicolas
- Added
- 6/8/2022 7:14 PM

No Services yet available. Go to Solutions to enquire how we can help you or how you can market your own expertise.
Enquire in Solutions how we can help you.
Please create Assets first to manage the Mass Balance Processes