Site

-
- Chiba Complex
-
- Idemitsu Kosan Co., Ltd.
- Site Category
- Refining and Chemicals Operations
- Postal Code
- 299-0107
- Location
-
/ Chiba
- Street
- 2-1 Anesakikaigan
- Website
- Description
-
Chiba Complex | Manufacturing flow
Refinery has around 50 refining units. Crude oil, mainly transported by large tankers from the Middle East, passes through these refining units to become petroleum products. One of the petroleum products, naphtha, is sent to a petrochemical plant and turned into petrochemicals through petrochemical units. It takes one day for crude oil to be turned into petroleum products after being sent to the atmospheric distillation unit, and another day for it to be turned into petrochemicals.
Major refining facilities (Refinery)
-
As of September 16, 2024
Atmospheric distillation equipment 1 unit 195,000 barrels per day Fluid catalytic cracker 1 unit 45,000 barrels/day Catalytic reformer 1 unit 17,000 barrels/day Heavy oil hydrodesulfurization equipment 1 unit 40,000 barrels/day Vacuum distillation equipment 1 unit 66,000 barrels/day Lubricating oil hydrorefining equipment 1 unit 11,600 barrels/day Lubricating oil hydrodewaxing equipment 1 unit 2,000 barrels/day Hydrogen production equipment 1 unit 980,000Nm3 /day aromatic extraction equipment 1 unit 8,200 barrels/day Kerosene deep desulfurization equipment 1 unit 60,000 barrels/day Light naphtha reformer equipment 1 unit 250,000 t/year Main manufacturing equipment (petrochemical plant)
Ethylene production equipment 374,000 t/year Aromatic production equipment paraxylene 265,000 t/year high boiling point solvent 20,000t/year Styrene monomer production equipment 210,000 t/year α-olefin production equipment 58,000 t/year Cyclohexane production equipment 115,000 t/year Polypropylene production equipment *1 286,000 t/year Syndiotactic polystyrene production equipment 9,200 t/year Composite resin manufacturing factory *1 54,100 t/year *1 Prime Polymer Co., Ltd.
Utility equipment
Refinery
Steam equipment (boiler including CO boiler) 5 units 1,060 t/hour Private power generation equipment 6 units 87,100kWh utility equipment industrial water - 60,000t/day sea water - 54,000m3/hour Petrochemical factory
Steam equipment 1 boiler 210 t/hour Private power generation equipment 2 groups 95,000kWh Water equipment industrial water - 22,780t/day Environmental protection equipment
Refinery
Flue gas desulfurization equipment 1 unit 270,000Nm3 /hour electrostatic precipitator 2 groups 793,000Nm3 /hour Comprehensive wastewater treatment
equipment (activated sludge
treatment equipment)1 unit 8,160t/day Petrochemical factory
Flue gas denitrification equipment
(BTX, ethylene, gas turbine boiler)1,470,000Nm3 /hour Comprehensive wastewater
treatment equipment9,000t/day Oil storage equipment
Refinery
crude oil tank 27 units Petroleum semi-finished products/product tanks 147 units LPG tank etc. 32 units Lubricating oil semi-finished products/product tanks 134 units lubricant additive tank 27 units chemical tank 25 units Petrochemical factory
Raw material/semi-finished product tank
86 units 119,200kL High pressure gas tank 16 units 10,700 tons
-
Site Master Settings
- Status
- A
- V
- P
System Info
- Modified by
-
Kokel, Nicolas
- Modified
- 4/23/2025 8:13 AM
- Added by
-
Braun, Uwe
- Added
- 10/11/2022 11:11 AM

No Services yet available. Go to Solutions to enquire how we can help you or how you can market your own expertise.
Enquire in Solutions how we can help you.
Please create Assets first to manage the Mass Balance Processes