Asset
- Ethylene Glycol Plant
- ZPC Zhoushan
- Zhejiang Petroleum & Chemicals Co., Ltd.
-
12th Apr 2021
ZPC is building a No.3 naphtha-fed cracker, also with 1.4mn t/yr of ethylene capacity. The No.3 cracker will likely be put into operations late in the third quarter or early in the fourth quarter of this year. Its integrated downstream units include a 300,000 t/yr ethylene vinyl acetate plant, a 400,000 t/yr low-density polyethylene line, a 280,000/600,000 t/yr propylene oxide/styrene monomer unit, a 100,000/800,000 t/yr EO/EG plant, a 450,000 t/yr PP line and a 400,000/250,000 t/yr phenol/acetone unit.
(Source)
Asset Info
- Category
- Processing
- Status
- A
- V
Additional Info
- Utilization Planning
- Asset Level
- UoM
- Metric Ton
- Startup Date
- 09/2021
System Settings
- User
-  Kokel, Nicolas
- Modified
- 11/24/2024 6:29 PM
- Added
- 11/24/2024 6:19 PM
  Units Quick Access
Unit | D | Technology-Unit | Category |
---|---|---|---|
Default Unit |
|