Communicator
News |
TECHNOLOGIE ALREADY OPERATING Natural Gas Steam Reforming Rectisol Gas Cleaning Methanol Synthesis Methanol to Olefins (DMTO) Residual Oil Catalytic Thermal Cracking (DCC) Veba Combi Cracking (VCC) Plant Near-zero Wastewater Discharge System TECHNOLOGIES CURRENTLY UNDER CONSTRUCTION OR IN PROJECT PHASE Naphtha and Light Diesel Comprehensive Utilization Project Methanol Gasification Slag Comprehensive Utilization Project MTBE Unit Low-temperature Heat Utilization Project Coal Gasification Conversion Condensate Environmental Protection Comprehensive Management Project Methane Conversion Air Preheater Upgrade Energy-saving Project Photovoltaic Power Generation Project Carbon Capture Utilization and Storage (CCUS) Demonstration Project These technologies are mentioned as part of the company's comprehensive utilization strategy or future plans without clear operational status or startup dates explicitly indicated: C4 Mix to Olefin Conversion Unit (OCU) (mentioned implicitly as part of the olefin downstream processing chain) C5 Mix Recycling (implied as part of comprehensive utilization but not explicitly detailed with dates or capacities.) Coal-Methane Co-gasification Technology (mentioned as a future planned project without explicit details on dates or capacities.) Propane and Isobutane Dehydrogenation for Acrylic Acid and Esters Production (mentioned as planned projects without explicit details on dates or capacities.) |
Technology |
Coal power plant has been added and a generic technology created. |
News |
Market Information at 10:36, November 22, 2024 | Sina Finance APA Tianchen Company is mainly responsible for the construction of the air separation and gasification units of the project. The air separation unit is equipped with two sets of 60,000 standard cubic meters/hour space separation equipment, and the gasification unit is equipped with three 286,331 standard cubic meters/hour (CO+H2) synthesis gas gasifiers. It is reported that since the start of the project, the Xinjiang Zhongtai Project Department has fully mobilized various resources, leveraged its project management advantages, led all participating units to overcome difficulties, promoted high-standard and high-quality construction of the project, and successfully completed the contract schedule goals. |
Operations |
The Lotte Ineos manufacturing site in Seoul is being developed with the Mass Balance of #Gasification , #AceticAcid Production and #VAM Process modelled in the system.
|