logo
N°3 Naphtha Cracker
ZPC Zhoushan
logo
Zhejiang Petroleum & Chemicals Co., Ltd.

10th Mar 2021

But phase 1 has one 1.4 million mt/year ethylene unit while phase 2 plans to double the capacity with two ethylene units.

(Source)

12th Apr 2021

ZPC is building a No.3 naphtha-fed cracker, also with 1.4mn t/yr of ethylene capacity. The No.3 cracker will likely be put into operations late in the third quarter or early in the fourth quarter of this year. Its integrated downstream units include a 300,000 t/yr ethylene vinyl acetate plant, a 400,000 t/yr low-density polyethylene line, a 280,000/600,000 t/yr propylene oxide/styrene monomer unit, a 100,000/800,000 t/yr EO/EG plant, a 450,000 t/yr PP line and a 400,000/250,000 t/yr phenol/acetone
unit.

(Source)

Asset Info

Category
Processing
Status
A
V
Technology-Icon
Technology

Technology
Technip Steam Cracking
Licensor
Technip Energies NV
Additional Info

Utilization Planning
Asset Level
UoM
Metric Ton
Startup Date
06/2021
System Settings

User
UserPic  Kokel, Nicolas
Modified
11/24/2024 6:41 PM
Added
2/24/2023 8:58 AM
  Units Quick Access
Unit D Technology-Unit Category
Default Unit